lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

What is the lateral area of the rectangular prism with a base length of 17 m, a base width of 7 m, and a height of 5 m?
solve 2/3 + 1/4x = 1/3
Buck drove 220 miles in 5 hours. What was his average rate of speed?
Which word is an interjection commonly used in advertising?
The graph of y = 4x - 11 is translated up 8 units. Which equation represents the translated graph? f y = 4x - 19 g y = 4x - 3 h y = 12x - 11 j y = 12x - 3
The circumference of a circle is 6.28.What is the area of the circle?
The chickens on a certain farm consumed 600 pounds of feed in half a year. During that time the total number of eggs laid was 5,000. If the feed cost $1.25 per
Which of the following rivers is the world's busiest waterway ?
The base of right prism is rhombus of diagonal is 6 and 8cm and altitude is 12 cm find total surface area
The length of a pool is 3 feet more than twice its width. If the perimeter of the pool is 72 feet, find the dimensions of the pool by writing and solving a syst