alishertlv alishertlv
  • 14-05-2020
  • Mathematics
contestada

Four workers finish some work in 90 minutes. How much time it will take six workers to finish same work

Respuesta :

Wishing Wishing
  • 14-05-2020

Answer:

135 minutes.

Step-by-step explanation:

Let's use a ratio:

workers : minutes

     4       :      90

     1        :     22.5

     6       :      135

It will take them 135 minutes (it seems wrong but...)

Answer Link

Otras preguntas

Enzyme are types of?
What happens to particle movement/speed when energy is added to a phase?
What is the line of reflection for the trapezoids?
Sylvia buys a case of water that contains 24 bottles and sells x number of bottles to her co-workers. Sam buys a case of water than contains 36 bottles and sell
Consider the figure. Determine the value of x.​
What does Ira Berlin mean when he says that freedom and slavery were created at the same moment? How does creating an “out” group strengthen the identity and st
What would my grade be if I have a 68 and I get a 95 on a test
Should a country try to increase their power?
is the equation y + 1 equals 8 (x + 6) in point-slope form?​
What introduction proof is FH=FG=GH