a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

Civil rights involve what area of government?
Kelley hypothesized that people make causal attributions by observing: Select one: A. Effort and ability B. Consensus, distinctiveness, and consistency C. Stere
A new article reported that college students who have part-time jobs work an average of 15 hour per week. The staff of a college from for newspaper thought that
What is a answer that has been rounded calked
These are jobs that brought Chinese immigrants to the Pacific Northwest: fishing working in canneries building the railroads all the above
High-density polyethylene may be chlorinated by inducing the random substitution of chlorine atoms for hydrogen. Determine the concentration of Cl (in wt%) that
joe and Eric have to ship 75 packages. Joe can do the job alone in 5 hours. if Eric helps, they get it done in 4 hours. How long would it take Eric to do the jo
The reaction 2PH3(g)+As2(g)⇌2AsH3(g)+P2(g) has Kp=2.9×10−5 at 873 K. At the same temperature, what is Kp for each of the following reactions?Parts A, B, and CPa
Is there a way to get the answers to a NCCER book test?
please help with Spanish problems, sorry the schedule is so small hopefully you can read it to answer the following questions.1.) Los miercoles, la ultima clase