maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

what is 90 mi/h to mi/min
rabbits have large ears. infer how this adaptation helps the rabbit meet its needs
Spoken word and written text are different because?
a water tank holds 24,000 gallons how many hours will it take for two thirds of the water to be used if the water is used at an average rate of 650 gallons per
Which fraction expresses -30/54 in lowest terms? A. - 10/27 B. - 10/18 C. - 15/27 D. - 5/9
Jack broke apart 5×216 as (5×200) (5×16) to multiply mentally. What strategy did Jack use?
There were 276 people on an airplane. Write a number greater than 276
Which one of the following countries is a major exporter of cut flowers? A. Portugal B. Canada C. Uruguay D. Colombia
Bailey got 7 bows for her birthday.She lost 1/3 of her bows at school.When she got home,she realized she only had 42 bows left.How many bows did she have before
The polar head of a phospholipid is made of _______ molecules. a. phosphate b. protein c. carbohydrate d. fatty acid