victorharrell2003
victorharrell2003 victorharrell2003
  • 01-05-2021
  • Computers and Technology
contestada

PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

The _____ method of budgeting is being employed when expenditures are allocated by assigning a fixed amount of the unit product cost to promotion and multiplyin
Suppose that five in eight couples disagree on a particular matter.What percent of couples disagree on the matter
Use the distributive property to show why the product (-6)(-3) is positive .
Let R be the region in the first quadrant of the​ xy-plane bounded by the hyperbolas xyequals​1, xyequals9​, and the lines yequals​x, yequals4x. Use the transfo
Lyla made a scale drawing of a city park. She used the scale 1 millimeter = 1 meter. What is the scale factor of the drawing?
At hockey practice, Savannah made 19 out of 20 shots. Write the fraction of shots Savannah missed as decimal
From a random sample of potential voters in an upcoming election 47% indicated they intended to vote for candidate R A 95 percent confidence interval was constr
12x+9−20x HELP ME PLEASE
g(n) = 2n + 4 f(n) = 2n^2 - 4 Find g(n) - f(n)
How do the authors use structure in thesepassages to create conflict and tension? Check allof the boxes that are correct.Both authors create tension and conflic