An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

Rachel finds that she gets distracted when she is trying to complete her homework. Explain how she could use these steps of the engineering design process to ad
what is 0.068% of 7700? round to the nearesthundredth​
Now that you have brainstormed three events, decide which experience you will write about and list it below
Find the length of the missing side if necessary round to the nearest tenth
solve for x a 12, b -10 ,c -12 ,d 12​
If 3 out of 24 students made and “A” what percent of students made an “A”
Double a certain number and subtract 4 the result is 6 and what is the number
Point Y lies in between points X and Z on a given line. The length of XZ = 30, and the length of YZ = 10. Find the length of XY.
PLEASE HELP!! Two pipes are filling a tank. The larger pipe can fill a tank three times as fast as the smaller pipe. With both pipes working, the tank can be fi
Write these numbers in order of size, starting with the smallest. 43 , 92, √196, 3√125