rsetser435 rsetser435
  • 02-11-2017
  • Business
contestada

Each task in a systems development project should culminate in one or more ________.

Respuesta :

920michaedlewis 920michaedlewis
  • 02-11-2017
deliverables is the answer
Answer Link

Otras preguntas

what is the product of 4+3i and 4-3i
Jin,Marco, and Myra each cut a length of wire for an electronics projects. Jin wires was 25 hundredths meter long, Marco was 6 tenths meter long and Myra's was
the normal force is the force that a surface exerts when you move an object over it. True or false.
How do you write 3.56 million
Show two ways three peoples can share a 5 segment chewy worm
Word problem in Algebra - Two boys, Shawn and Curtis, went for a walk, Shawn began walking 20 seconds earlier than Curtis. Shawn walked at a speed of 5 feet pe
A drawer has some red, green, and blue marbles. There are 33 marbles. There are 4 times as many red marbles as green marbles. There are half as many blue marble
what part of colonial culture does the Gullah dialect reflect
Which event did Emerson call "the shot heard round the world"? A. the shots fired at the Boston Massacre B. the first shot fired at Lexington C. the last shot f
What events are most likely to occur along a transform boundary? A. deep-sea trenches B. rugged mountain ranges C. earthquakes D. hot spots