Seudónimo Seudónimo
  • 02-06-2018
  • Mathematics
contestada

It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

If price is between AVC and ATC, the best and most practical thing for a perfectly competitive firm to do is : continue operating, but plan to go out of busines
a rigjt triangle with two congruent legs is always 45-45-90
HELP ?!!!! ITS TIMEDDD !!!
What Storage Area Network (SAN) protocol runs on top of TCP, and can be used on an existing twisted-pair Ethernet network, while maintaining low cost? a. Intern
Find the odds for and the odds against the event rolling a fair die and getting 4,2,5 and 6
Carbon disulfide is a colorless liquid. When pure, it is nearly odorless, but the commercial product smells vile. Carbon disulfide is used in the manufacture of
A uniform rectangular plate is hanging vertically downward from a hinge that passes along its left edge. By blowing air at 11.0 m/s over the top of the plate on
Find parametric equations that describe the circular path of the following object. Assume​ (x,y) denotes the position of the object relative to the origin at th
A six-sided die (with numbers 1 through 6) and an eight-sided die (with numbers 1 through 8) are rolled. What is the probability that there is exactly one 6 sho
Describe what would happen to the biosphere if any one of the four components of biodiversity (genetic, species, ecological, functional) were somehow eliminated