contestada

a contractor estimates that he can paint a house in 5 days using 6 men. if he actually uses 5 men for the job, how many days will they take to paint the house?

Respuesta :

Einstein08 Einstein08
  • 01-09-2018
it will take 4 days to paint the house with 5 men
Answer Link
tramserran
tramserran tramserran
  • 01-09-2018

1 house = 6 men x 5 days  = 30 man days

Need 30 man days with only 5 men: 30x = 5 men   →  x = 6

It will take 6 days for 5 men to complete the job.

Answer: 6 days


Answer Link

Otras preguntas

Please help me with these problems
Which answer shows a correct order to solve this story problem?    Maurine had to pay $2.52 tax on her purchases. She bought 3 books for $12.99 each, 2 pens for
What prevented European from exploring the world sooner during the Middle Ages?
At to-go pizza each pizza cost $12 and each small salad costs $2. A delivery charge of $3 is added to every order. How much would it cost to have 6 pizzas and 3
Find the scale factor of the line segment dilation. AB: endpoints (−6, −2) and (−6, 8) to A'B': endpoints at (−6, 0) and (−6, 5), centered at the (−6, 2)
A box measures ft. long, ft. wide, and ft. high. find the volume of the box in inches.
Which line would most likely be written by a reader analyzing hamlet through a formalist lens?the female characters in the play are defined by their relationshi
32.62÷10 Help please
Alejandro no esta seguro de que la tienda se_____ los sabados. A.abre B.abrio C.abra D.abria
True or false The value 3pi/2 is a solution for the equation 2sin^2x -sin x -1=0