Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

Advance tickets for a school play went on sale. The price of each student ticket was $4 and everyone else paid $5. On the first day, no more than $80 in tickets
What happens to a mirror when a ray is directed at it
What is 0.07 in scientific notation?
what is a solid figure that has three pairs of parallel faces and all faces are congruent
what is 21/56 and 63/81 in simplest form
how do macrophages protect your body from infection?
George Washington was the first President of the United States under the constitution.
Why was there a debate between the federal and state governments over the funding of transportation improvements? A,each wanted credit for the new developments.
a gust of wind blows an apple from a tree. As the apple falls, the gravitational force on the apple is 2.25N downward and the force of the wind on the apple is
wha t is the world largest punctuation mark