medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

The setting described at the beginning of the story supports the banker's A. need to retract the large bet. B. ability to make a large bet. C. reason for b
Please help as soon as possible! : ) 1. In your own words, explain the role of the digestive, endocrine, and excretory systems in maintaining homeostasis. 2. Wh
The base of a triangular prism is an isosceles right triangle with a hypotenuse of √50 centimeters. The height of the prism is 8 centimeters. Find the surface a
Which substance plays a central role in determining the rate of sodium reabsorption? which substance plays a central role in determining the rate of sodium reab
Bruce has a rope that us 21 feet long he needs to cut the rope into 1/5 feet long strips how many strips can Bruce cut from his rope
what do individual shareholders gain when they buy shares of a company`s stock
Where did the texas governor rank on schlesinger's 1961-62 scale?
what is 5-10m factorised
A rectangular cake has a length of 15 inches and a width of 15 inches. How many whole, square pieces of cake with side lengths of 2 1/2 inches can be cut from t
What is 2x-3=4(x-5)? And also what is 2x squared=50?