shresthasamrachana06
shresthasamrachana06 shresthasamrachana06
  • 01-04-2021
  • Mathematics
contestada

12 workers can do a peice of work in 20 days. How many workers should be added to complete work in 16 days?​

Respuesta :

atchleyamirah69
atchleyamirah69 atchleyamirah69
  • 01-04-2021
3 workers

if 12 workers can do a piece of work in 20 days, then one person can do it in 240 days. 240/16 is 15. That is the number of workers that you need in total to it in 16 days. Since the question ask how many more workers,
15 - 12 = 3 more workers.
Answer Link

Otras preguntas

What is penelope test and how does odysseus pass it
Which reactants form the salt CaSO4(s) in a neutralization reaction? (1) H2S(g) and Ca(ClO4)2(s) (2) H2SO3(aq) and Ca(NO3)2(aq) (3) H2SO4(aq) and Ca(OH)2(aq) (4
Which element forms a compound with chlorine with the general formula MCl? (1) Rb (3) Re (2) Ra (4) Rn
When an Arrhenius acid dissolves in water, the only positive ion in the solution is (1) H+ (3) Na+ (2) Li+ (4) K+
Why was the continental congress unable to fix the economic crisis after the American revolution?
what is the solution to 2x-y=9
Which polyatomic ion contains the greatest number of oxygen atoms? (1) acetate (3) hydroxide (2) carbonate (4) peroxide
A cone has a diameter of 30 in. and a slant height of 17 in. What is the approximate volume of the cone? Use 3.14 to approximate the value of PI. Round your a
The ultimate decision by Hitler to exterminate all Jews
The solubility of KClO3(s) in water increases as the (1) temperature of the solution increases (2) temperature of the solution decreases (3) pressure on the sol