argilagoso9 argilagoso9
  • 02-01-2022
  • Mathematics
contestada

If 7 men can do a job in 24 days and 3 men are fired from the job how long will the remaining men take

Respuesta :

mwall62
mwall62 mwall62
  • 02-01-2022

Answer:

36 Days to Do the job

Step-by-step explanation:

Answer Link

Otras preguntas

8×1+5×(1/100)+9(1/1000)
Which conversion factors are used to convert 18 cm/s to meters per minute? Select each correct answer.1. 1m/100cm2. 100cm/1m3. 1 min/60s4. 60s/1min
The ratio of girls to boy in the junior high band is 5 to 7. At the beginning of the year, there were 72 students in the band. By the end of the year, the ratio
4.185 divided by 0.93
anyone?? (picture)...
African elephants flat their large ears to cool off. Which biology theme does this phenomenon represents? A. continuity and change B. relationship of stricture
Which of these statements best describes Solomon's rule of king as Israel? A.) His military operations secured the borders of Israel B.) He united the 12 separa
Shun is going to flip a fair coin 450 times. Complete the following statement with the best prediction the coin will land talls up
Friend me if you want to get healthy I can answer most of your questions. Do you want to get healthy?
Evan is thinking of a 3-digit odd number that uses digit 7 twice. The digit in the tens place is less than 1. What is the number?