In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Solve the quadratic equation 2x + x-7 = 0 Give your answers to 2 decimal places.
A runner is 7/8 mile from the finish line. If she can travel 3/8 mile per minute, how long will it take her to finish the race?​
Can someone answer this for me?
Height and weight are used to determine your body mass index, which is an estimate of your body composition. True Or False
I WILL GIVE BRAINLIEST PLS HELP ME
Which is a surgical procedure used to stop bleeding? hemospasm hemorrhage hemostasis hemolysis
What would be the safest way to reduce the impact of the the non-native red fire ant while minimizing the impact on other organisms
What are the different changes that female experiences within mentrual cycle
7.early Roman temples were designed and decorated to be viewed from _____ perspective(s). A) A single B)two C)three D)All 8.Romans built on a scale and in qu
Geometry! Use the diagram of triangle MNO where, X, Y, and Z are the midpoints of the sides.