When using the _______________ scheduling technique, the work in an activity is interrupted to work on another activity and is then resumed at a later point in time?

Respuesta :

ujgvugrntvtgn ujgvugrntvtgn
  • 06-06-2017
splitting or multitasking 
Answer Link

Otras preguntas

Compared to the inside of the resting plasma membrane, the outside surface of the membrane is
How was the early slave trade in west africa different from that of east africa?
How long does it take to travel to Mercury while going 100,000 km per hour?
In regard to how historians work, which phrase BEST describes the inquiry phase? A. the phase in which the historian generates questions about a particular su
What do you think this means,her eyes were like two green moons in the darkness
The line of Demarcation Was a imaginary line that divided control of the territory in the Americas between which two countries
what is the greatest common factor of 45m and 6m^5
Suggest an environment would not need a cuticle.
4.7+m=1.8. Solve for m
Select the correct conjugation of the verb jugar. A que hora _______ ustedes? 1) juegan 2) jugamos 3) jugar 4) juega