ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

What results if cells do not respond to the normal mechanisms that control cell division?
A 15 kg mass is moving at 7.50 meters per second on a horizontal, frictionless surface. What is the total work that must be done on the mass to increase it's sp
Which words in this sentence are an independent clause? Tide pools are depressions in rocks along the coastline that fill with seawater when the tide retreats
suppose there are 20 questions on a multiple-choice test. if 25% of the answers are choice B,how many of the answers are NOT choice B ?
Danny charges $35 for 3 hours of swimming lessons.Martin charges $24 for 2 hours of swimming lessons. Who offers a better deal?
what did the algonquian people wear
The total cost for a bowling game includes the fee for the shoe rental plus a fee per game. The cost of each game increases the price by $4. After 3 games, the
which of the following can have a quaternary structure? A) fatty acid B) protein c) DNA D) Polysacharide
According to Montresor, he decides to seek revenge against Fortunato because Fortunato __________. A. attacked him with his fists B. injured him more than a tho
t is important to avoid ballistic stretches because they can increase body and muscle temperature extend a joint beyond its regular range of motion exceed the s